VOKERA Linea Service Manual Page 15

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 14
13
Linea
4.5.3.1 INSTALLATION OF TWIN ADAPTOR KIT (fig.
10)
Insert the exhaust connection manifold onto the
appliance flue outlet.
Place the silicone seal (supplied with twin
adapter kit) over the rim of the exhaust con-
nection manifold.
Remove the required blanking plate (located to
the left and right of the appliance flue outlet)
and – using the same screws – install the air
baffle.
Using the hole in the exhaust connection mani-
fold as a guide, drill a 3mm hole in the appli-
ance flue spigot and secure the exhaust mani-
fold connection to the flue spigot using the screw
provided.
4.5.3.2 INSTALLATION OF CONDENSATE DRAIN
KIT (fig. 11)
The condensate drain kit must be fitted within 1
metre of the appliance flue outlet. It is recom-
mended that the condensate drain kit should be
fitted in the vertical plane, however it can be fit-
ted horizontally with care.
Fit the first bend to the condensate drain kit or
exhaust connection manifold by firmly push-
ing in to position.
Using the two holes in the exhaust connection
manifold as a guide, drill a 3mm hole in each
and secure using the screws provided.
Connect the air inlet pipe to the air baffle as
above.
Prime the condensate trap with clean water prior
to commissioning the appliance.
The twin flue pipes extensions and accesso-
ries can now be installed by pushing together
(the plain end of each extension or bend should
be pushed approximately 50mm into the female
socket of the previous piece).
4.5.3.3 HORIZONTAL TERMINATION (See fig. 12)
The twin flue system must be converted to the
dedicated concentric flue kit for termination.
The horizontal terminal is supplied with a built-
in converter box and cannot be shortened.
A 130mm hole is required for the passage of
the concentric terminal through the wall.
The air inlet pipe must always be level with or
below, that of the exhaust pipe.
Depending on site conditions it may be prefer-
able to install the terminal assembly prior to fit-
ting the twin flue pipes.
Mark and drill a 130mm hole for the passage of
the horizontal flue terminal, ensuring that there is
a 1° fall back to the boiler (17mm per 1000mm).
Insert the terminal assembly into the flue hole.
Push-fit the twin flue pipes onto the concentric to
twin converter box ensuring that the exhaust pipe
connects to the exhaust connection on the con-
centric to twin converter.
If necessary cut the plain ends (male) of the twin
flue pipes to allow connection to the concentric
to twin converter.
NOTE; before cutting twin flue pipes ensure al-
lowances have been made for connection onto
the previous piece and onto the concentric to twin
converter. The last twin flue pipes must be
pushed 50mm onto the male spigots of the con-
centric to twin converter.
NOTE;
You must ensure that the entire flue system is
properly supported and connected.
Seal the flue terminal assembly to the wall using
cement or a suitable alternative that will provide
satisfactory weatherproofing. The interior and
exterior trim can now be fitted.
Fig. 12
Fig. 11
Page view 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 51 52

Comments to this Manuals

No comments