VOKERA Linea Service Manual Page 16

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 15
14
Linea
4.5.3.4 VERTICAL TERMINATION (See fig. 13)
The twin flue system must be converted to the
dedicated concentric flue kit for termination.
The vertical terminal is supplied with a built-in
converter box and cannot be shortened.
A 130mm hole is required for the passage of
the concentric terminal through the ceiling and/
or roof.
Depending on site conditions it may be prefer-
able to install the terminal assembly prior to fit-
ting the twin flue pipes.
Fit the appropriate flashing plate to the roof and
insert the vertical flue terminal through the flash-
ing plate from the outside, ensuring that the col-
lar on the flue terminal fits over the flashing.
Push-fit the twin flue pipes onto the concentric to
twin converter ensuring that the exhaust pipe con-
nects to the exhaust connection on the concen-
tric to twin converter.
If necessary cut the plain ends (male) of the twin
flue pipes to allow connection to the concentric
to twin converter.
NOTE
Before cutting twin flue pipes ensure allowances
have been made for connection onto the previ-
ous piece and onto the concentric to twin con-
verter. The last twin flue pipes must be pushed
50mm onto the male spigots of the concentric
to twin converter.
You must ensure that the entire flue system is
properly supported and connected.
Ensure that any horizontal sections of pipe have
a 1° fall towards the appliance (17mm per
1000mm).
Fig. 13
4.6 CONNECTING THE GAS AND WATER
The appliance is supplied with a fixing jig that
includes service valves (fig. 14). The service
valves are of the compression type. The acces-
sories pack contains sealing washers etc, for use
with the service valves.
When connecting pipe work to the valves, tighten
the compression end first then insert the sealing
washers before tightening the valve to the appli-
ance.
NOTE
It will be necessary to hold the valve with one
spanner whilst tightening with another.
Fig. 14
Filling Loop
Cold water Inlet
Stopcock/filling
valve
Hot water
Outlet
Gas
Cock
Safety valve
outlet
C/H return
valve
C/H flow
valve
4.6.1 GAS (fig. 6 & 14)
The appliance is supplied with a 15mm service
valve, connect a 15mm pipe to the inlet of the
valve and tighten both nuts.
NOTE
It will be necessary to calculate the diameter of
the gas supply pipe to ensure the appliance has
an adequate supply of gas.
4.6.2 FLOW & RETURN (fig. 6 & 14)
The appliance is supplied with 22mm service
valves for the flow and return connections, con-
nect a 22mm pipe to the inlet of each valve and
tighten both nuts.
NOTE
Depending on system requirements, it may nec-
essary to increase the size of the flow & return
pipe work after the service valve connections.
Page view 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 51 52

Comments to this Manuals

No comments